






This product was developed to address critical pain points in the construction industry, such as rising labor costs, uneven quality of frame materials, and the increasing height of buildings. Originally introduced and co-developed in partnership with Spain’s RESA GROUP, it has obtained official recognition and promotion from China’s Ministry of Housing and Urban-Rural Development (MOHURD): it passed the MOHURD achievement assessment in September 2009, was listed as one of the “Ten Key Promoted Technologies” for new formwork and scaffolding systems in 2010, and designated as a “National Construction Science & Technology Achievement Promotion Project” in 2012. It also won Beijing Certified Construction Methods in 2012, further verifying its technical maturity and reliability.
| Parameter | MC-36/15 Twin-Mast Type | MC-36/15 Single-Mast Type |
|---|---|---|
| Maximum Height of First Support Point from Ground | 6 m | 6 m |
| Maximum Load Capacity | 36 KN | 15 KN |
| Maximum Span Between Supports | 6 m | 6 m |
| Maximum Number of Personnel | 5 | 3 |
| Maximum Platform Length | 30.10 m | 9.8 m |
| Platform Width | 1.35 m | 1.35 m |
| Maximum Extended Platform Width | 0.95 m | 0.95 m |
| Operating Speed | 6 m/min | 6 m/min |